Import Machinery Setting

1. Un-packing in terminal 1 2. Un-packing in terminal 2 3. Deliver by low bed trailer
4. Lifting 5. Moving into factory 6. Fix & confirm moving point
7. Moving to indoor 8. Lifting up 1 9. Lifting up 2
10. Lifting up 3 11. Lifting up 412. Lifting up 5
13. Fix the machine & stallation 14. Another parts of machine 15. Assist engineer on stallation
16. Stallation production line 17. Machine checking & connection 18. Control box connection
19. Confirm electric power supply 20. Final checking 21. Surveyor report finished